230299
| 1 | A. | Approval of Accounts Payable | Payroll/Accounts Payable | Approval of Accounts Payable
For the period ending September 8, 2023 in the amount of $261,467.61. | approved | Pass |
Action details
|
Not available
|
230312
| 1 | B. | Approval of Village Payroll | Payroll/Accounts Payable | Approval of Village Payroll
For the period ending September 9, 2023 in the amount of $1,012,448.93. | approved | Pass |
Action details
|
Not available
|
230313
| 1 | C. | Approval of Accounts Payable | Payroll/Accounts Payable | Approval of Accounts Payable
For the period ending September 15, 2023 in the amount of $1,270,833.84. | approved | Pass |
Action details
|
Not available
|
230304
| 1 | D. | Purchase of New Single Axle Dump Truck with Snow Plow and Salt Spreader and Approval of Ordinance Declaring 2013 Dump Truck as Surplus Property | Ordinance | Purchase of New Single Axle Dump Truck with Snow Plow and Salt Spreader and Approval of Ordinance Declaring 2013 Dump Truck as Surplus Property
Request for a waiver of bids and award of a contract to Rush Truck Centers of Northern Illinois, in the amount of $274,992.92. The International chassis is available for joint purchase from Rush Truck Centers through Sourcewell Contract #060920-NAV. The dump body, plow and salt spreader are also available for joint purchase with Monroe Truck Equipment through Sourcewell Contract #062222-AEB. Approval of an Ordinance declaring Unit ST342, a 2013 International dump truck with plow and salt spreader, as surplus and authorizing their sale and/or disposal. Staff requests a waiver of first reading. | waived of first reading and passed on second reading with suspension of the rules | Pass |
Action details
|
Not available
|
230216
| 5 | E. | | Ordinance | PC 23-13: 2001 S Highland Avenue - (Sonesta Suites/Churchwick Partners)
The Plan Commission submits its recommendation of approval of the following actions on the subject property, located within the B3 Community Shopping District:
1. A Comprehensive Plan amendment to High Density Residential from Community Commercial;
2. A map amendment (rezoning) to the R5 General Residence District;
3. A variance for minimum lot area (density) for 29.57 dwelling units per acre, where 24.2 dwelling units per acre are required pursuant to Section 155.410(D)(4)(a)
4. A variance for minimum open space of 35%, where a minimum of 40% is required pursuant to Section 155.410(I)(4),
5. A variance to provide 1.2 spaces per dwelling unit, where 1.5 spaces per dwelling unit are required, pursuant to Section 155.602, Table 6.3. (per the petitioner's amended site plan, this variance is no longer needed and is removed from the request). (DISTRICT #3) | passed on second reading | Pass |
Action details
|
Not available
|
230269
| 2 | F. | | Ordinance | ZBA 23-06: 525 S. Edson Avenue
The Zoning Board of Appeals submits its recommendation to approve a variation from Section 155.407(F)(3) of the Lombard Zoning Ordinance to reduce the required interior side yard setback from six feet (6’) to three and five tenths feet (3.5’) for the subject property located within the R2 Single-Family Residence Zoning District. The requested relief is for an addition to an existing nonconforming single-family residence located on the subject property. (DISTRICT #1) | passed on second reading | Pass |
Action details
|
Not available
|
230287
| 1 | G. | North Avenue Pressure Adjusting Station Rehab & Building Replacement Design/Build Contract, Change Order #1 | Resolution | North Avenue Pressure Adjusting Station Rehab & Building Replacement Design/Build Contract, Change Order #1
Requesting a contract time extension of 99 days. The revised contract time represents delays related to ComEd service drop request and supply chain issues for various Mechanical/Electrical components. (DISTRICT #4) | adopted | Pass |
Action details
|
Not available
|
230289
| 1 | H. | Manhole Rehabilitation Program, Change Order #2 | Resolution | Manhole Rehabilitation Program, Change Order #2
Reflecting a decrease to the contract with Structured Solutions, L.L.C. in the amount of $7,250.56. This decrease represents the final field measured quantities for the pay items within the contract. (DISTRICTS - ALL) | adopted | Pass |
Action details
|
Not available
|
230294
| 1 | I. | North Grace Street Utility Improvements, Change Order #2 | Resolution | North Grace Street Utility Improvements, Change Order #2
Reflecting an increase to the contract with John Neri Construction Company, in the amount of $58,442.50. The revised contract amount represents field-measured quantities for contract pay items associated with the water and sewer improvements and supplemental pricing for work not covered by existing pay items. (DISTICT #4) | adopted | Pass |
Action details
|
Not available
|
230297
| 2 | I-2. | | Resolution | Downtown Improvement & Renovation Grant 10-12 S. Park Avenue
A recommendation from the Economic and Community Development Committee to approve:
1. A Downtown Renovation & Improvement Grant request of up to $50,000 for the proposed façade reconstruction improvements; and
2. A Downtown Renovation & Improvement Grant request to exterior accessibility improvements of $18,100 for the proposed exterior patio area. (DISTRICT #1) | adopted | Pass |
Action details
|
Not available
|
230298
| 2 | I-3. | | Development Project | Grove Tavern Restaurant (2-8 W. St. Charles Road)
A contingency amendment to the grant approval for the project, which could result in utilization of the Downtown Business Grant (Economic Development Fund) in lieu of TIF funding, if the project is not fully complete by December 31, 2024. (DISTRICT #1) | adopted | Pass |
Action details
|
Not available
|
230212
| 2 | J-2. | | Request | National Citizens Survey
Recommendation from the Community Relations Committee to contract Polco to conduct a Village wide resident survey. The cost for this assessment is $22,000 and includes the primary survey administration, data collection, analysis, and report generation. | approved | Pass |
Action details
|
Not available
|
230310
| 1 | J. | 22nd Street Manhole Improvements Construction Contract | Bid | 22nd Street Manhole Improvements Construction Contract
Award of a contract to John Neri Contruction Company, Inc. of Addison, Illinois, the lowest responsible bidder of two (2) bids received, in the amount of $258,700.00. This project includes improvements to the 22nd Street Chamber where the force mains tie into the gravity sewer. (DISTRICT #3) | approved | Pass |
Action details
|
Not available
|
220320
| 2 | A. | Feasibility Analysis for a Joint Public Safety Facility | Request | Feasibility Analysis for a Joint Public Safety Facility *** To View the PresentationReferenced click here
The Village has completed it's evaluation of a Joint Public Safety Facility to address operational and facility deficiencies. The report and recommendation from FGM Architects were presented to the Public Safety & Transportation Committee at their September 6, 2023 meeting. The Committee unanimously voted to accept the recommendations and have the report and recommendations presented to the Village Board of Trustees for consideration. Staff and the Committee recommend that the Village Board of Trustees accept the FGM Architects report and recommendation and utilize the findings as a roadmap for future facility improvements. (DISTRICT #6) | approved | Pass |
Action details
|
Video
|