File #: 250141    Version: 1 Name: South Lombard Elevated Storage Tank - Design/Build Professional Engineering Support Services
Type: Resolution Status: Passed
File created: 4/7/2025 In control: Village Board of Trustees
On agenda: Final action: 4/17/2025
Title: South Lombard Elevated Storage Tank - Design/Build Professional Engineering Support Services Approving a contract with Baxter &Woodman/Boller Design Build in conjunction with CB&I, in an amount not to exceed $11,149,637.00. The Village will utilize the design-build method of procurement for the design and construction of the 1.5 million gallon water tower located along Butterfield Road. The Village used the Qualification Based Selection (BS) procurement strategy for the project. (DISTRICT #3)
Attachments: 1. 250141 Board Meeting Attachment 4.17.25, 2. R 19-25

Title

South Lombard Elevated Storage Tank - Design/Build Professional Engineering Support Services

Approving a contract with Baxter &Woodman/Boller Design Build in conjunction with CB&I, in an amount not to exceed $11,149,637.00. The Village will utilize the design-build method of procurement for the design and construction of the 1.5 million gallon water tower located along Butterfield Road. The Village used the Qualification Based Selection (BS) procurement strategy for the project. (DISTRICT #3) 