Title:
|
South Lombard Elevated Storage Tank - Design/Build Professional Engineering Support Services
Approving a contract with Baxter &Woodman/Boller Design Build in conjunction with CB&I, in an amount not to exceed $11,149,637.00. The Village will utilize the design-build method of procurement for the design and construction of the 1.5 million gallon water tower located along Butterfield Road. The Village used the Qualification Based Selection (BS) procurement strategy for the project. (DISTRICT #3)
|