File #: 230417    Version: 1 Name: South Park Avenue Pedestrianization Project Change Order No. 1
Type: Resolution Status: Passed
File created: 12/5/2023 In control: Village Board of Trustees
On agenda: Final action: 12/21/2023
Title: South Park Avenue Pedestrianization Project Change Order No. 1 Reflecting an increase to the contract with R.W. Dunteman Company in the amount of $204,443.65. This Change Order includes changing the original design of asphalt roadway surface to concrete. Also included is the work required to replace the water main on South Park Avenue. It was discovered that the water main was in critical condition and staff recommended replacing the main now to both reduce the risk of future water main breaks and to ensure we would not have to excavate for a water main replacement within the project limits. (DISTRICT #3)
Attachments: 1. 230417 Board Meeting Attachment 12.21.23, 2. R 70-23, 3. RW Dunteman South Park Ave Pedestrianization Change Order 1, 4. Cover Page 230417.pdf

Title

South Park Avenue Pedestrianization Project Change Order No. 1

Reflecting an increase to the contract with R.W. Dunteman Company in the amount of $204,443.65. This Change Order includes changing the original design of asphalt roadway surface to concrete. Also included is the work required to replace the water main on South Park Avenue. It was discovered that the water main was in critical condition and staff recommended replacing the main now to both reduce the risk of future water main breaks and to ensure we would not have to excavate for a water main replacement within the project limits. (DISTRICT #3)

Body

[Enter body here.]