File #: 230231    Version: 1 Name: St. Charles Road Resurfacing Improvements Design Engineering Contract Amendment #1
Type: Resolution Status: Passed
File created: 6/26/2023 In control: Village Board of Trustees
On agenda: Final action: 7/20/2023
Title: St. Charles Road Resurfacing Improvements Design Engineering Contract Amendment #1 Reflecting an increase to the contract with Christopher B. Burke in the amount of $134,828.23. This amendment is for a CIP project that includes roadway reconfiguration, expanded parkways, streetscape beautification, and pedestrian improvements on Park Avenue from St. Charles Road to Michael McGuire Drive. In the original design contract, the scope included potential improvements enhancing Park Avenue between St. Charles Road and Michael McGuire Dreive/Metra Station. Contract Amendment #1 will provide the design engineering necessary to create final plans and construction documents for the proposed streetscape work on Park Avenue. (DISTRICTS #1 & #4)
Attachments: 1. 230231 Board Meeting Attachment 7.20.23, 2. R 34-23.pdf, 3. Cover Page 230231.pdf

Title

St. Charles Road Resurfacing Improvements Design Engineering Contract Amendment #1

Reflecting an increase to the contract with Christopher B. Burke in the amount of $134,828.23. This amendment is for a CIP project that includes roadway reconfiguration, expanded parkways, streetscape beautification, and pedestrian improvements on Park Avenue from St. Charles Road to Michael McGuire Drive.  In the original design contract, the scope included potential improvements enhancing Park Avenue between St. Charles Road and Michael McGuire Dreive/Metra Station. Contract Amendment #1 will provide the design engineering necessary to create final plans and construction documents for the proposed streetscape work on Park Avenue. (DISTRICTS #1 & #4)

Body

[Enter body here.]