Title:
|
South Lombard Elevated Water Tower- South Water Tower Metering/Pressure Adjusting Station 14E Project
Approving a contract with Baxter & Woodman/Boller Construction in an amount not to exceed $9,306,642.00 for the design and construction of the South Lombard Elevated Water Tower South Water Tower Metering/Pressure Adjusting Station 14E project. The project will be funded and constructed over two calendar years. (DISTRICT #3)
|