File #: 200047    Version: 1 Name: Portable Generator Receptacle Project, Preliminary Design Engineering (Phase 1)
Type: Resolution Status: Passed
File created: 1/17/2020 In control: Village Board of Trustees
On agenda: Final action: 2/6/2020
Title: Portable Generator Receptacle Project, Preliminary Design Engineering (Phase 1) Approving a contract with Christopher B. Burke Engineering, LTD, in an amount not to exceed $27,596.00 for preparation of preliminary design engineering documents related to the improvement of the portable generator receptacle connections at 20 pumping stations throughout the Village's water, sewer and storm water system network. (DISTRICTS - ALL)
Attachments: 1. 200047 BOT 2-6-20.pdf, 2. R 6-20.pdf, 3. Cover Page 200047.pdf

Title

Portable Generator Receptacle Project, Preliminary Design Engineering (Phase 1)

Approving a contract with Christopher B. Burke Engineering, LTD, in an amount not to exceed $27,596.00 for preparation of preliminary design engineering documents related to the improvement of the portable generator receptacle connections at 20 pumping stations throughout the Village's water, sewer and storm water system network. (DISTRICTS - ALL)

Body

[Enter body here.]